RANK LOCAL GOV'T PROJECT TYPES

TYPE IMPROVEMENT

PHASE '02 '03 '04 '05 TOTAL PROJECT COST
    STP LOCAL              
1

EL

PHASE II COMPUTERIZED SIGNAL PROJECT AT VARIOUS INTERSECTIONS 

SIGNALIZATION
  STP-M-NHE-9103(3)
ALL
FHWA 103.0
TDOT 0.0
LOCAL 0.0
TOTAL 103.0

_

_

_

FHWA 103.0
TDOT 0.0
LOCAL 0.0
TOTAL 103.0
2

JC
LRTP #7

SIGNALIZATION NORTH STATE OF FRANKLIN ROAD CORRIDOR

SIGNALIZATION WITH FIBER OPTICS
NUMBER NOT ASSIGNED
ALL
FHWA 1,100.0
TDOT 0.0
LOCAL 0.0
TOTAL 1,100.0

_

 

_

 

_

 

FHWA 1,100.0
TDOT 0.0
LOCAL 0.0
TOTAL 1,100.0
3

EL
LRTP #13

SR 67AT BEMBERG (WALMART INTERSECTION)

SIGNALIZATION
  STP-M-NHE-67(15)
ALL
FHWA 114.0
TDOT 0.0
LOCAL 0.0
TOTAL 114.0

_

 

_

_

FHWA 114.0
TDOT 0.0
LOCAL 0.0
TOTAL 114.0
3A

EL
LRTP #13

PHASE III COMPUTERIZED SIGNAL PROJECT AT VARIOUS INTERSECTIONS

SIGNALIZATION  
STP-M-9103(7)
ALL
FHWA 450.0
TDOT 0.0
LOCAL 0.0
TOTAL 450.0

_

_

 

_

FHWA 450.0
TDOT 0.0
LOCAL 0.0
TOTAL 450.0
4

JC
LRTP #
9

 SR 34 (BRISTOL HIGHWAY) FROM SR 381 TO SR 36

RECONSTRUCT TO 5 LANES (LENGTH OF 0.76 MILES)
NUMBER NOT ASSIGNED
PE

_

FHWA

240.0

TDOT 60.0
LOCAL 0.0
TOTAL 300.0

_

_

FHWA

240.0

TDOT 60.0
LOCAL 0.0
TOTAL 300.0
5

EL
LRTP #15

LYNN AVENUE FROM BROAD (US 321) TO "G" STREET

RECONSTRUCT TO 5 LANES (LENGTH OF 0.33 MILES)
NUMBER NOT ASSIGNED
PE

_

FHWA 100.0
TDOT 0.0
LOCAL 25.0
TOTAL 125.0
_ _
FHWA 100.0
TDOT 0.0
LOCAL 25.0
TOTAL 125.0

''

 

''

 

''

 

''

 

ROW _ _
FHWA 100.0
TDOT 0.0
LOCAL 25.0
TOTAL 125.0
   

''

 

''

 

''

 

''

 

CON _ _ _
FHWA 1,699.2
TDOT 0.0
LOCAL 424.8
TOTAL 2,124.0
FHWA 2,059.2
TDOT 0.0
LOCAL 514.8
TOTAL 2,574.0

_

_

 SUMMARY

_

_

_

_

_

STP LOCAL
PROJECT TOTALS

FHWA 4,066.2
TDOT 60.0
LOCAL 514.8
TOTAL 4,581.0
RANK LOCAL GOV'T

STP ENHANCEMENT

TYPE IMPROVEMENT PHASE

'02

'03 '04 '05 TOTAL PROJECT COST  
1

JO

SR 381 STATE OF FRANKLIN BIKEWAY: ETSU TO WEST MARKET
STP-EN-9107(9)
CONSTRUCTION OF BIKEWAY FACILITY   ALL
FHWA 160.0
TDOT 0.0
LOCAL 40.0
TOTAL 200.0

_

_

_

FHWA 160.0
TDOT 0.0
LOCAL 40.0
TOTAL 200.0
2 EL RIVERFRONT LINEAR WALKING/BICYCLE PATH: DOE RIVER TO SYCAMORE SHOALS  
STP-EN-1000(18)
CONSTRUCTION OF BIKEWAY/PEDESTRIAN  FACILITY     ALL
FHWA 144.0
TDOT 0.0
LOCAL 36.0
TOTAL 180.0
_ _ _
FHWA 144.0
TDOT 0.0
LOCAL 36.0
TOTAL 180.0
3 JC SR 381 BIKEWAY
STP-EN-9107(12)

CONSTRUCTION OF BIKEWAY/PEDESTRIAN  FACILITY  

ALL
FHWA 320.0
TDOT 0.0
LOCAL 80.0
TOTAL 400.0

_

_

_

FHWA 320.0
TDOT 0.0
LOCAL 80.0
TOTAL 400.0
4 JO SITE AMENITIES FOR STORYTELLING CENTER  
STP-EN-9000(39)
CONSTRUCTION OF PARK AND PEDESTRIAN FACILITIES   ALL
FHWA 392.85
TDOT 0.0
LOCAL 98.21
TOTAL 491.06

_

_ _
FHWA 392.85
TDOT 0.0
LOCAL 98.21
TOTAL 491.06
5 EL IMPROVEMENTS TO HISTORIC COVERED BRIDGE
STP-EN-9103(9)
BRIDGE MAINTENANCE ALL
FHWA 98.0
TDOT 0.0
LOCAL 24.5
TOTAL 122.5

_

_

_

FHWA 98.0
TDOT 0.0
LOCAL 24.5
TOTAL 122.5
6 EL RIVERFRONT LINEAR WALKING/BICYCLE PATH: PHASE IV CONSTRUCTION OF BIKEWAY/PEDESTRIAN  FACILITY ALL
FHWA 144.0
TDOT 0.0
LOCAL 36.0
TOTAL 180.0

_

_

_

FHWA 144.0
TDOT 0.0
LOCAL 36.0
TOTAL 180.0
7 EL RIVERFRONT LINEAR WALKING/BICYCLE PATH: PHASE V
STP-EN-9103(8)
CONSTRUCTION OF BIKEWAY/PEDESTRIAN  FACILITY ALL
FHWA 150.0
TDOT 0.0
LOCAL 37.5
TOTAL 187.5

_

_

_

FHWA 150.0
TDOT 0.0
LOCAL 37.5
TOTAL 187.5
_ _ ENHANCEMENT SUMMARY _ _

_

_

_

ENHANCEMENT
PROJECT TOTALS

FHWA 1,408.85
TDOT 0.00
LOCAL 352.21
TOTAL 1,760.86
RANK LOCAL GOV'T

STATE/U.S. HIGHWAYS

TYPE IMPROVEMENT

PHASE '02 '03 '04 '05 TOTAL PROJECT COST  
1
LRTP #1
EL

SR 91 (STONY CREEK ROAD) FROM SR 37 (US 19E) TO WEST OF GREEN VALLEY ROAD

RECONSTRUCT TO 5 LANES  (LENGTH OF 2.5 MILES) FUND: STP-STATE STAGE CON
FHWA 6,320.0
TDOT 1,580.0
LOCAL 0.0
TOTAL 7,900.0

_

_

_

FHWA 6,320.0
TDOT 1,580.0
LOCAL 0.0
TOTAL 7,900.0
2
LRTP #2
JC SR 36 (KINGSPORT HIGHWAY) FROM SR 381 TO SR 354 RECONSTRUCT TO 5 LANES (LENGTH OF 2.0 MILES) FUND: STP PE
FHWA 0.0
TDOT 300.0
LOCAL 0.0
TOTAL 300.0

_

_

_

_

'' '' '' FUND: STP-STATE ROW
FHWA 2,880.0
TDOT 720.0
LOCAL 0.0
TOTAL 3,600.0

_

 

_

_

'' '' '' FUND: STP-STATE CON

_

FHWA 4,940.0
TDOT 1,235.0
LOCAL

0.0

TOTAL 6,175.0

_

_

 
'' '' '' FUND: HPP CON _
FHWA 1,540.0
TDOT

385.0

LOCAL

0.0

TOTAL 1,925.0
_ _
FHWA 9,360.0
TDOT 2,640.0
LOCAL 0.0
TOTAL 12,000.0
3
LRTP #3
EL ELIZABETHTON NORTHERN CONNECTOR 4.0 MILES OF CONSTRUCTION ON NEW ALIGNMENT FUND: HPP PE
FHWA 0.0
TDOT 800.0
LOCAL 0.0
TOTAL 800.0

_

_

_

_

'' '' '' FUND: STP-STATE ROW
FHWA 2,880.0
TDOT 720.0
LOCAL 0.0
TOTAL 3,600.0

_

_

_

_

'' '' '' FUND: STP-STATE CON _ _
FHWA 8,560.0
TDOT 2,140.0
LOCAL 0.0
TOTAL 10,700.0
_  
'' '' '' FUND: HPP CON _ _
FHWA 3,600.0
TDOT 900.0
LOCAL 0.0
TOTAL 4,500.0
_
FHWA 15,040.0
TDOT 4,560.0
LOCAL 0.0
TOTAL 19,600.0
4
LRTP #4
EL SR 362( GAP CREEK ROAD): FROM SR 361 TO SR 67 5.8 MILES RECONSTRUCT TO 2/3 LANE   FUND: STP-STATE PE
FHWA 640.0
TDOT 160.0
LOCAL 0.0
TOTAL 800.0

_

_

_

_

'' '' '' '' ROW _ _
FHWA 2,160.0
TDOT 540.0
LOCAL 0.0
TOTAL 2,700.0

_

FHWA 2,800.0
TDOT 700.0
LOCAL

0.0

TOTAL 3,500.0
5
LRTP #5
JC SR 36 (KINGSPORT HIGHWAY) FROM SR 354 TO SR 75  RECONSTRUCT TO 5 LANES 
FUND: STP-STATE
ROW _
FHWA 1,760.0
TDOT 440.0
LOCAL 0.0
TOTAL 2,200.0
_ _
FHWA 1,760.0
TDOT 440.0
LOCAL 0.0
TOTAL 2,200.0
6
LRTP #9
JC SR 34 (BRISTOL HIGHWAY) FROM SR 381 TO SR 36 RECONSTRUCT TO 5 LANES (LENGTH OF 0.76 MILES)
NUMBER NOT ASSIGNED
ROW    
FHWA 784.0
TDOT 196.0
LOCAL 0.0
TOTAL 980.0
   
''

 

''

 

''

 

''

 

CON      
FHWA 2,480.0
TDOT 620.0
LOCAL 0.0
TOTAL 3,100.0
FHWA 3,264.0
TDOT 816.0
LOCAL 0.0
TOTAL 4,080.0
_ _ STATE/U.S. SUMMARY _ _

_

_

_

PROJECT TOTALS

FHWA 38,544.0
TDOT 10,320.0
LOCAL 0.0
TOTAL 46,000.0

 

RANK LOCAL GOV'T

BRIDGE REPLACEMENT

TYPE IMPROVEMENT

PHASE '02 '03 '04 '05 TOTAL PROJECT COST  
1 EL

BRIDGE OVER DOE RIVER (LM 0.11) ON ELK AVENUE RT. 3939

BRIDGE REPLACEMENT FUND - BRR-L ROW
FHWA 24.0
TDOT 0.0
LOCAL 6.0
TOTAL 30.0

_

_

_

_

''

 

''

 

''

 

''

 

CON _ _
FHWA 852.0
TDOT 0.0
LOCAL 213.0
TOTAL 1,065.0

_

FHWA 876.0
TDOT 0.0
LOCAL 219.0
TOTAL 1,095.0
2 JO BRIDGE OVER LITTLE LIMESTONE CREEK ROAD AT LM 0.49 ON FOX AVENUE (ROUTE 1359) IN JONESBOROUGH BRIDGE REPLACEMENT FUND - BRR-L ROW

_

FHWA 20.0
TDOT 0.0
LOCAL 5.0
TOTAL 25.0
 

_

_

'' '' '' '' CON _ _
FHWA 240.0
TDOT 0.0
LOCAL 60.0
TOTAL 300.0
 
FHWA 260.0
TDOT 0.0
LOCAL 65.0
TOTAL 325.0
3 EL BRIDGE OVER WATAUGA RIVER & COUNTY ROAD ((LM 5.16) ON STATE ROUTE 400 BRIDGE REPLACEMENT FUND BRR-S PE

_

FHWA 60.0
TDOT 15.0
LOCAL 0.0
TOTAL 75.0

_

_

__

'' '' '' '' ROW _ _
FHWA 24.0
TDOT 6.0
LOCAL 0.0
TOTAL 30.0

_

_
'' '' '' '' CON

_

_

_

FHWA 1,680.0
TDOT 420.0
LOCAL 0.0
TOTAL 2,100.0
FHWA 1,764.0
TDOT 441.0
LOCAL 0.0
TOTAL 2,205.0
_ _ SUMMARY _ _

_

_

_

BRIDGE PROJECT TOTALS

FHWA 2,900.0
TDOT 441.0
LOCAL 284.0
TOTAL 3,625.0
RANK LOCAL GOV'T

DEMONSTRATION

 PROJECTS

  '02 '03 '04 '05 TOTAL PROJECT COST  
1 JC INTELLIGENT TRANSPORTATION SYSTEM PHASE II  TRAFFIC MANAGEMENT AND MONITORING SYSTEM FUND: ITS ALL
FHWA 1,230.00
TDOT 153.75
LOCAL 153.75
TOTAL 1,537.50

_

_

_

FHWA 1,230.00
TDOT 153.75
LOCAL 153.75
TOTAL 1,537.50
2 JC

INTELLIGENT TRANSPORTATION SYSTEM PHASE III NON-INTERSTATE

TRAFFIC/TRANSIT MANAGEMENT AND MONITORING SYSTEM FUND: ITS ALL

_

_

FHWA 2,420.0
TDOT 0.0
LOCAL 605.0
TOTAL 3,025.0

_

FHWA 2,420.0
TDOT 0.0
LOCAL 605.0
TOTAL 3,025.0
3 JC

INTELLIGENT TRANSPORTATION SYSTEM PHASE III TDOT ROUTES

I-26 TRAVELER INFORMATION SYSTEM:  FUND ITS

ALL

_

_

_

FHWA 1,600.0
TDOT 400.0
LOCAL 0.0
TOTAL 2,000.0
FHWA 1,600.0
TDOT 400.0
LOCAL 0.0
TOTAL 2,000.0
4 WA U.S.D.A. CHEROKEE NATIONAL FOREST BUFFALO MOUNTAIN BIKE TRAIL SYSTEM DEVELOPMENT

RECREATIONAL TRAIL: WASHINGTON AND UNICOI COUNTIES
FUND RTP

ALL
FHWA 17.403
TDOT 0.0
LOCAL 4.53
TOTAL 21.753

_

_

_

FHWA 17.403
TDOT 0.0
LOCAL 4.53
TOTAL 21.753
5 CA ELIZABETHTON RIVERFRONT LINEAR WALKING/BICYCLE TRAIL PHASE IV RECREATIONAL LINEAR/WALKING BICYCLE TRAIL
FUND RTP
ALL
FHWA 80.0
TDOT 0.0
LOCAL 20.0
TOTAL 100.0
     
FHWA 80.0
TDOT 0.0
LOCAL 20.0
TOTAL 100.0
_ _ SUMMARY _ _

_

_

_

DEMO PROJECT TOTALS

FHWA 5,622.4
TDOT 553.75
LOCAL 783.28
TOTAL 6,959.43
   

FTA SECTION 5310

             
1 DH

HANDICAPPED TRANSPORTATION

PURCHASE TWO 15- PASSENGER VANS ALL
FTA 39.6
TDOT 0.0
AGENCY 4.4
TOTAL 44.0

_

 

_

FTA 39.6
TDOT 0.0
AGENCY 4.4
TOTAL 44.0
     

ILLUSTRATIVE

LIST OF FUTURE

NEEDS

     
***
 
JC JOHNSON CITY TRANSIT CAPITAL PURCHASE OF TROLLEYS (STP-FLEX) ALL

_

_

_

2 TROLLEYS AT $250,000 EACH

TO BE DETERMINED

***
LRTP #19
JC TENNESSEE STREET FROM LAMONT TO JOHN EXUM PARKWAY 5-LANE EXTENSION ALL _

_

_

APR COMPLETE

TO BE DETERMINED

***
 
LRTP #16
JO PAYNE ROAD (ROUTE 3983) FROM SR 34 TO SR 81 2-LANE IMPROVEMENT ALL _

_

_

APR COMPLETE

TO BE DETERMINED

***
LRTP #8

JC/ WA

KNOB CREEK RAIL UNDERPASS

RECONSTRUCTION ALL POSSIBLE CONGRESSIONAL DEMONSTRATION

_

_

NEEDS MORE EVALUATION ON FEASIBILITY

TO BE DETERMINED

***

JC

VA-ETSU ACCESS FACILITY FOR MEDICAL SCHOOL 2-LANE IMPROVEMENT ALL POSSIBLE CONGRESSIONAL DEMONSTRATION

_

_

NEEDS MORE EVALUATION ON FEASIBILITY

TO BE DETERMINED

***  
LRTP #11

JC/ WA

I-181 (FUTURE I-26) RECONSTRUCTION

RECONSTRUCTION TO SIX LANES

ALL

_

_

_

STUDIES UNDERWAY

TO BE DETERMINED

***  
LRTP #25

JC/EL

OPERATIONS AND MAINTENANCE OF TRAFFIC OPERATIONS CENTERS

FUTURE STP PROJECT

ALL          

 

        By agreement between TDOT and the MPO, this TIP includes any Resurfacing, Rehabilitation or Restoration (3R) and Safety Projects to be funded on the National Highway System (NHS); 3R and Safety Projects funded with Surface Transportation Program (STP) funds; bridge projects funded with Bridge Rehabilitation and Rehabilitation (BR) funds that do not provide through lanes; and Safety and Enhancement Projects funded with STP funds. These type projects may not be specifically listed in the tables. They are minor projects that do not alter the functional capacity of a facility and do not impact regional air quality emissions.  Note:  All future schedules subject to availability of funds.
 

     "LRTP" numbers refer to evaluations as assigned in the Long-Range Regional Transportation Plan adopted in 2001. 
For comments on any current or proposed project in the TIP please e-mail Alan Bridwell atb@tricon.net

 

 

        ***The Illustrative List of Future Projects provides a contingency list if unanticipated funding becomes available via TEA 21 programs.  The Transportation Improvement Program is financially constrained to include only projects with known funding sources available.

 

Recipient Key  

 

JC   CITY OF JOHNSON CITY
EL   CITY OF ELIZABETHTON
JO   TOWN OF JONESBOROUGH
WA   WASHINGTON COUNTY
CA   CARTER COUNTY
DH   DAWN OF HOPE DEVELOPMENT CENTER